Q1. Teams may encounter the need for “technical” user stories. Who decides the priority of these?
the Product Owner with help from Operations
the Tech Lead with help from the Product Owner
the Product Owner with help from the Tech Lead
the Tech Lead with help from Operations
Q2. What is the Scrum Master’s role during the daily stand-up?
Congratulate the team on their great work.
Stand outside the circle of developers and listen for impediments.
The Scrum Master should not attend—this meeting is for developers only.
Ask each developer what they did since the last daily standup.
Q3. Which factor should not be considered during Sprint Planning?
the team’s velocity
the number of stories in the product backlog
the stories that are ready
the team’s capacity
Q4. A team member has been showing signs of great personal distress: crying at work, snapping at colleagues, having heated phone conversations. As Team Facilitator, what should you do?
Give the team member space and time to deal with their personal issues.
Tell the others on the team that their teammate needs some emotional support.
Notify the team member’s manager of your observations and ask the manager for help.
Ask the team member if they would like to talk about what might be going on with them personally.
Q5. Which statement describes the flow of work in the Scaled Agile Framework?
It is a “push” system.
It is “push” at the top and “pull” at the bottom.
It is a “pull” system.
It is neither “push” nor “pull.”
Q6. What is the Product Owner’s role in deciding the priority of work in the sprint backlog?
None—the Scrum Master should prioritize the work in the sprint backlog.
The PO should prioritize the items in the sprint backlog.
The developers prioritize work unless they cannot complete it, in which case the PO should prioritize the remaining work.
None—the developers should prioritize the work in the sprint backlog.
Q7. The Scaled Agile Framework advocates that, if you measure only one thing, what should you measure?
quality
predictability of delivery
cost of delay
return on investment
Q8. Why should you apply Weighted Shortest Job First?
to maximize the return on investment
to determine the economic sequencing of the backlog
to visualize queue length
to fulfill a commitment to quality
ReferenceWeighted Shortest Job First (WSJF) is a prioritization model used to sequence jobs (eg., Features, Capabilities, and Epics) to produce the maximum economic benefit. In a flow-based system, priorities are updated continuously to provide the best economic outcomes. Job sequencing, rather than individual job return on investment, produces the best result. To that end, WSJF is used to prioritize backlogs by calculating the relative CoD and job size (a proxy for the duration).
Q9. You have classified the features in your backlog according to risk and value. Which features should the development team work on first?
low-value and high-risk
high-value and high-risk
high-value and low-risk
low-value and low-risk
ReferenceIt is suggested that high business value, high-risk items are worked on first. While that may seem counterintuitive, the earlier this work is done, the sooner the team will move to mitigate the issues and unknowns—leading to a higher quality product. If there's a failure, it will occur early and relatively inexpensively.
Q10. In the Scaled Agile Framework, what is the role of Enablers?
They help extend the Architectural Runway.
They connect vision to mission so the organization can be successful.
They support team building.
They remove the impediments to quality.
Q11. Which outcome is not expected of a Sprint Review?
The team demonstrates its completed work.
The team reflects on how to improve its performance.
Items in the backlog may be reprioritized.
Stakeholders ask questions about the completed and upcoming backlog items.
Q12. What is not a technique used for splitting user stories?
split by line-of-business
split compound user stories
split by alternative paths
split by interface
Q13. Who decides what the team will work on?
the Scrum Master
a self-organizing team
the Product Owner
the Product Manager
Q14. Which choice is not a Scrum value?
focus
integrity
courage
commitment
Q15. What should happen if the Product Owner does not accept a story by the end of the iteration?
The team does not get credit for the story’s points in its velocity calculation.
The story should be sliced to reflect the work completed.
The acceptance criteria should be adjusted to reflect the work completed.
The story should be shown to stakeholders for their feedback.
Q16. Which statement is not true about the product backlog?
It is a list of work items that are behind schedule.
The items are maintained in priority order.
Anyone on the team can propose an item for it.
It includes all of the work to be done.
Q17. A project has some major risks that the team wants to mitigate. What is the best way to monitor how well this effort is going?
risk-based spike
risk-adjusted backlog
risk velocity chart
risk burndown graph
Q18. The VP of Engineering wants to start giving out a “Team Member of the Sprint” award to recognize a top performer in each group. What advice should you give this VP?
This is unhelpful unless there has been recent employee feedback indicating that people feel underappreciated.
This is a good idea as long as a different person is recognized in each sprint.
This is a good idea because awards can motivate people to do their best.
This is unhelpful because it can destroy the team unity essential to achieving high performance.
Q19. What is a difference between a team’s task board and a Kanban?
A Kanban has an explicit rule to limit WIP.
A Kanban shows the backlog of work.
A Kanban does not use a Definition of Done.
A Kanban shows the status of the work items.
ReferenceExplicit rule applies to scrum team's task board: tasks cannot be added to the scrum board in the middle of a sprint.
Q20. The team complains that “things have been falling through the cracks lately.” What should you do?
Ask the team’s manager to make role assignments so the team can catch up.
Conduct a workshop to identify all of the things that need to be done and see who can help with each.
Refer to the team’s RACI (Responsible, Accountable, Consulted, Informed) assignments.
Meet with the Tech Lead and Product Owner to try to identify what can be done.
Q21. In Large-Scale Scrum, what is the recommended ratio of Scrum Masters to teams?
One Scrum Master can support up to five teams.
Large teams should have two Scrum Masters.
There should be one Scrum Master per team.
One Scrum Master can support one to three teams.
Q22. In the Cynefin framework, where are “best practices” most appropriate?
in the Complex regime
in the Complicated regime
in the Chaotic regime
in the Obvious regime
Q23. A manager informs you that a developer from another team is between assignments, and she wants to place the developer on your team for a few sprints. What should you do?
Explain to the manager that this will be disruptive to the team and ask that another assignment be found.
Explain the situation to the team and ask them to go with the flow.
Explain the situation to your manager and ask them to resolve it.
When the temporary developer shows up, assign them to write documentation.
Q24. The Product Owner complains to you that the team is not working hard enough and they need to increase their velocity by at least 50%. Which action should you not take?
Share the feedback from the PO and challenge the team to increase their velocity.
Ask the PO to explain the business context to the team.
Explain the impact of technical debt to the PO and the benefits of devoting some capacity to reducing it.
Hold a Value Stream Mapping workshop to identify and reduce waste.
Q25. What is the name of the practice in which a cross-functional team collaborates intensively to develop a new product idea?
Hackathon
Scrum at Scale
Innovation and Planning
Magnum Focus
Q26. The team’s manager wants to attend the Sprint Retrospective. What should you do?
Agree to the manager’s request and notify the team.
Propose that the manager attend only every other retrospective.
Propose a different forum for the manager to meet with the team.
Ask the team if it is okay with them that the manager attend.
Q27. Who is responsible for a Scrum team’s performance?
the team
the Scrum Master
the Product Owner
the Engineering Manager
Q28. Which statement concerning small, frequent releases of software is true?
The chance for rollback is high.
It typically requires a high degree of automation.
The administrative costs are high.
Backward compatibility may be jeopardized.
Q29. What is the activity of clarifying and expanding user stories called?
story point estimating
Definition of Done
user story expansion
backlog refinement
Q30. Which strategy is preferred for development teams?
Optimize for most work done.
Maximize output and maximize outcome.
Maximize outcome while minimizing output.
Optimize for resource utilization.
"…your job is to minimize output, and maximize outcome and impact." - Jeff Patton
Q31. Which statement is true about the actor in a user story?
The actor does not have to be a specified role in the solution.
There must be multiple personas for each actor.
The actor can be the system itself.
The system cannot be the actor.
Q32. Which statement is true about Agile?
Agile requires a high degree of up-front planning.
Once the requirements are agreed to, the team can complete work.
Agile requires a high degree of discipline.
Agile works best when there is no contract.
Q33. Which statement about burndown and burnup charts is not true?
Burndown charts show the work remaining to be done.
Burnup charts show the work completed.
Burndown charts are more useful than burnup charts.
Agile project management tools can produce these automatically.
Q34. What is the name for the practice of going to see a process in use at the point of value delivery?
Six Sigma
Gemba walk
Total Quality Management
Kaizen
Q35. When the team needs to make a decision, what is the best course of action?
Try to achieve concensus.
Take a vote and the majority rules.
Identify the person who is most knowledgeable and ask them to decide.
Let the most senior member of the team decide.
Q36. Which action is something the Team Facillitator should NOT do?
Embrace servant leadership.
Estimate story points.
Celebrate successes.
Remove impediments
Q37. A team needs to do research, design, or prototyping. What is this type of story called?
Exploratory spike
Backlog refinement
Functional decomposition
R&D
Q38. Which statement about technical debt is true?
Technical debt is another name for bugs
It is at the Product Owner’s description to allocate effort to reduce technical debt.
Adding technical debt should be avoided at all costs.
Technical debt is what the Product Owner owes to the developers if they work a lot of overtime to complete the sprint.
Q39. Which statement about estimating is not true?
Absolute estimating is more reliable than relative estimating.
Relative estimating is more reliable than absolute estimating.
In estimating, accuracy is more important than precision.
In estimating, the effort is more important than the time required.
Q40. Which ceremony should the Product Owner not attend?
daily stand-ups
Sprint Retrospectives
story point estimating
code reviews
Q41. Which task is not the Product Owners responsibility?
estimating story points
refining acceptance criteria
giving feedback to developers about the user stories
demonstrating the work to stakeholders
Q42. Which choice is _not_ considered during Sprint Planning?
stories that meet the Definition of Done
team velocity
stories that meet the Definition of Ready
team capacity
Q43. You have noticed a pattern that the most interesting stories on the Sprint Backlog get started right away, and the least interesting stories languish or don’t get done. What should you do?
Use a lottery system assign each story.
Share your observation with the team and invite them to own and solve the problem.
During story point estimation increase the points assigned to the least interesting stories so the team can boost their velocity.
Ask the Tech Lead to assign every story to a developer so they all get done efficiently and with accountability.
Q44. What Agile practice best supports this principle: “At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly”?
Sprint Review
Sprint Retrospective
daily stand-up
Sprint Demo
Q45. On what are personas typically based?
a sponsors or team members’ personalities and traits
what the developers think is user friendly
real people, archetypal users, or composites of multiple users
descriptions of the product’s functionality and use
Q46. Which statement describes Shu Ha Ri?
It is a library of coding patterns.
It is a software testing strategy.
It is a standard for interface design.
It is a model for skill development and mastery.
Q47. What does the Agile Manifesto indicate?
Responding to change is more valuable than following a plan.
Documenting requirements up front is more valuable than at the end.
Following the plan is essential for not going over budget.
Contract negotiation should be used to settle disputes.
Q48. What is the main benefit of a working agreement?
It specifies core working hours.
It clarifies the reporting relationships on the team.
It defines the culture that the team aspires to achieve.
It compiles everyone’s information.
Q49. What is the name of the information radiator that has multiple columns used to visualize the flow of work?
Work Flow Indicator
Value Stream Map
Story Map
Kanban Board
Q50. Which is the best definition of story points?
They are a relative measure of the effort needed to complete a story.
They a measure of development time only, test time is considered separately.
They are a relative measure of the value of a story.
They are a measure of time to complete a story.
Q51. What is a Scrum of Scrums?
It is technique for two or more teams working together coordinate their efforts.
It is another name for the Scrum Master Community of Practice.
It is an information radiator used to compare the velocity of several teams.
It is the system demo for teams on the same release train.
Q52. What is the Product Owner’s role regarding the product backlog?
The PO must identify the intended users of the features on the backlog.
The PO is responsible for estimating the size of the total.
The PO must identify the dependencies that impact the backlog.
The PO decides what to include in the backlog and what to exclude.
Q53. Why should a team do refactoring?
It assigns developers to other teams in order to eliminate personality conflicts.
It improves the functionality of the product,
It recalibrates the success criteria for the product in the marketplace.
It improves the design, which can lead improved development efficiency and maintainability.
Q54. Which choice is not a benefit generally associated with product demonstrations?
Learn about new requirements.
Learn feature suitability.
Learn about feature usability.
Learn about feature estimates.
Q55. What is an information radiator?
a list of KPIs for the team
a list of overdue action items
the task board
a highly visible display of key performance data
Q56. According to the Agile Manifesto, your highest priority is to _.
minimize change requests
satisfy the customer
get the job done on time
achieve the desired ROI
Q57. Product development organizations sometimes use descriptions of archetypal users and their values so that developers can design the system to meet their needs and wants. What are these descriptions called?
actors
roles
agents
personas
Q58. The Product Owner is focused on testing a new system concept in the marketplace as quickly and inexpensively as possible. What is this first-generation product called?
preproduction version
focus group demonstrator
Generation 1 product
minimum viable product
Q59. To whom should the Product Owner report?
the Quality Manager
the Product Manager
the Scrum Master
the Engineering Manager
Q60. What happens in Sprint 0?
The team delivers no story points in that sprint.
The team does regression testing prior to release to production.
The team prepares to work on the product backlog.
This is the time to inspect and adapt.
Q61. What does the Definition of Done mean?
The story meets the INVEST criteria.
The team has completed all of the work in its Sprint.
The story has been handed off to the DevOps team.
The team has agreed on the criteria for story completion.
Q62. Which element is most important when describing your product?
its cost
its licensing terms and conditions
its benefits
its features
Q63. Which choice best describes the Team Facilitator?
a meeting scheduler
a record keeper
a project manager
an Agile coach
Q64. What is the name of the technique that divides a story into smaller pieces?
mitosis
story slicing
disaggregation
Divide and Conquer
Q65. A team member comes to you with a complaint about another team member. What should you do?
Bring the complaint to the other person and try to resolve the issue.
Ask them to talk to the other person and try to work it.
Notify HR of the problem and ask them to handle it.
Invite both people a meeting and try mediate the conflict.
Q66. What is the forming-storming-norming, performing model of team development known as?
the Tuckman model
the Standard Team model
Moore’s Team Framework
the Siebert model
Q67. What is the name of the ceremony in which you inspect the work completed during the sprint?
Sprint Retrospective
Sprint Review
Next-Sprint Planning
Velocity Confirmation
Sprint Retrospective: Reflect on the previous sprint, discuss what’s working well, what could be improved, and how to improve it to be more productive.ReferenceSprint Review: Discuss what has been accomplished during the sprint and whether the sprint goal has been met.
Q68. Which choice best describes an Agile Release Train (ART)?
continuous delivery
comprised of the teams within a program
DevOps Center of Excellence
Scrum of Scrums
Q69. As an Agile coach, what should be your attitude toward your team members individual goals and motivations?
Understand them—try align personal motivations with the team’s progress toward the project goals.
Nurture them-goals are the reason why people want to be at work.
Disregard them—personal views have no bearing on reaching the project goals.
Leverage them—use personal goals encourage team members raise their performance levels.
Q70. Which phrase best describes an Agile team?
self-directed
self-managed
self-sustaining
self-organizing
Q71. Which technique does not help prioritize the backlog?
MoSCow
Kano
WSJF
Kaizen
Q72. What does the Definition of Ready mean?
The story has been tested end is ready for release to production.
The story is ready to be brought into a sprint.
The stakeholders are ready to discuss their requirements for story.
The team has completed sprint 0 and is ready to work.
ReferenceDefinition of Ready means that stories must be immediately actionable. The Team must be able to determine what needs to be done and the amount of work required to complete the User Story.
Q73. Which is NOT a principle of the Scaled Agile Framework?
Centralize decision-making
Apply systems thinking
Take an economic view
Unlock the intrinsic motivation of knowledge workers
It is an inventory of the team’s knowledge and skills that is used to plan the work that they do.
It is the number of teams that a Team Facilitator can support concurrently.
It means the team determines their avalaibility for the next sprint.
It is the maximum number of stories that will be allowed in a sprint.
Q75. The team is complaining that they send request for clarification to the Product Owner, but these requests go unanswered. What action should you take?
If there is a question about story, tell the developers to use their best judgement, avoid delay, and discuss the issue in sprint review.
Send a note to the Product Owner saying the delays in completing the work will be their responsibility, not the team’s.
Develop a service-level agree (SLA) that defines certain response times for different types of request and ask the Product Owner to sign off on it.
Schedule a problem-solving session with the Product Owner and the other team members.
Q76. Which choice is a pillar of Lean?
Frequent delivery of working software
Respect for people and culture
Courage
Sustainable pace
ReferenceTwo pillars are (1) Continuous Improvement, and (2) Respect for People.
Q77. Which statement best describes Agile, Lean, and Six Sigma?
They are strategies for delivering customer value.
They were pioneered by Toyota.
They are strategies for discovering what the customer wants.
They are derived from statistical process control.
Reference - First paragraph clearly points out that Agile is about delivering value to the customer.
A description of what an actor wants to do in order to accomplish a goal
A description of archetypal users so the developers can make the solution user-friendly
A report from the field about a user’s experience with the product
The Agile term for a requirement
Q79. What is the expected output of a Planning Poker meeting?
The stories were discussed and each had a story point estimate assigned.
The team gave feedback to the Product Owner about the acceptance criteria.
The team decided what stories should be developed within the same sprint.
The team made a preliminary plan for which stories will be completed in the next quarter.
Q80. What is the definition of velocity?
The number of story points delivered during a sprint
The average waiting time for a story on the sprint backlog
The average wait time for a story to move from the product backlog to the sprint backlog
The time it takes a developer to complete a story divided by its relative value
Q81. What is most important for a successful Product Owner to understand?
The budget for the product.
The underlying technology of the product.
The development team’s strengths and weaknesses.
The business context for the product.
ReferenceA Scrum Team has 3 roles - Product Owner, Scrum Master and Developers. All 3 roles generate Value in their own contexts; however, it is the Product Owner who maximizes the Value from a product or business context.
Q82. Which statement about the Agile Manifesto is true?
It was written via crowdsourcing and its authors are unknown.
It has been translated into dozens of languages and used around the world.
It was written in 2001 and is obsolete.
It was first published as part of Jim Highsmith’s doctoral thesis.
Q83. The team is not going to complete its Sprint Commitment. As the Team Facilitator, what should you do?
Ask the PO to extend the sprint.
Advise the PO as soon as possible.
Report this at the Sprint Review.
Point out the reasons why and collaborate on solutions.
Reference, the last paragraph perfectly informs what an agile developer would do in this situation.
Q84. When a user story is further decomposed, what are the elements called?
technical tasks
actors and actions
Who, What, Why
threads
Q85. What does collective ownership mean?
Every member of the team can make changes to any part of the code as necessary.
If someone is at fault, then the whole team is at fault.
The team shares equally in the profits that the product generates.
The team, not the individuals, receive performance evaluations.
Q86. According to the Agile Manifesto, how often should developers and business people work together?
as often as needed
biweekly
daily
weekly
Q87. What do you call the practice of writing a test before the code is written?
design for testability
test-driven development
unit testing
test then code
Q88. What is the term for a team member who is “T-skilled”?
cross-functional
jack-of-all-trades
apprentice developer
generalizing specialist
Q89. Which statement is not true about pair programming?
It has been discredited because it is too expensive.
In pair programming, two developers share one computer and take turns at the keyboard.
It is a great way to teach someone who is new to the team.
The code produced by two developers who are collaborating is typically higher quality than if they were working alone.
Q90. People with a fixed mindset _ .
have better focus and longer attention spans
are more goal oriented
tend to be more resilient
are more afraid of failure
Q91. How can you impove interaction between team members?
Move people’s workstations around in the team room to create new social possibilities.
Ask the team if they would like to do something recreational together and offer to organize it.
Tell the team that you see this as a problem and ask them to solve it.
Since no one has come to you with a complaint, assume that the limited interaction works for everyone.
Q92. What is the expected outcome of the daily stand-up meeting?
updated status on all of the work
team alignment on its plan for the day
a list of impediments and priorities
a report to the Product Owner of stories ready to be accepted
Q93. What is the name of the technique in which a story includes an input, a translation of input to output, and an output?
input-output processing
ITIOO story format
thin vertical slice
structured coding
ITIOO isn’t a thing, thin verticle slicing is refering to what work you prioritise, and structured code has nothing to so with stories.
Q94. What is the term for a team member who is “T-shaped”?
cross-functional
jack-of-all-trades
generalizing specialist
apprentice developer
ReferenceOne of the challenges for organisations when they move to Agile ways of working is the often mentioned need to build teams made up of "T-shaped" people. This can also be described as a cross-functionality.
Q95. What is a lean canvas?
It is used to decompose solution into epics, features, and stories
It is a template for lightweight business plans that makes your assumptions explicit
It is a tool to plan future project releases
It is a technique for projecting growth in market share.
Reference1-page business plan template that helps you deconstruct your idea into its key assumptions using 9 basic building blocks.
Q96. The team is not going to complete its Sprint Commitment. As Team Facilitator, what should you do?
advise the PO as soon as possible
point out the reasons why and collaborate on solutions
report this at the Sprint Review
Ask the PO to extend the sprint
Referencenon verified answer - extend, otherwise goes to backlog
Q97. Which of these traits is most important for being an effective Team Facilitator?
being self-aware
being extroverted
having type A personality (def not this :P)
being someone who takes charge
Referencenon verified answer - A facilitator is someone who helps a group identify common objectives and then offers group processes to achieve defined outcomes while maintaining neutrality. A skilled facilitator consciously embodies self-awareness, self-management, and bias management, while conveying openness and enthusiasm.
Q98. When is the best time to update the team’s burndown chart?
before the Sprint Retospective
after the daily stand-up
before the daily Scrum
before quarterly planning
Q99. What is Empathy Map?
It is a team-building technique used to increase productivity.
It is a tool used by organizations for competitive intelligence.
It is a retrospective technique used to improve team morale.
It is a collaborative tool used to gain deeper insights into customers.
Q100. Which work descriptions are not written in the language of users?
tasks
epics
stories
features
Q101. The team has an incomplete story at the end of the sprint and wants to claim partial credit for the work completed. What should you do?
Ask the Product Owner to accept the storyy with the promise that the team will complete it in the next sprint
Ask them to slice the story to reflect the work done and the work to be done
Ask the product owner to revise the acceptance criteria so it can be accepted and counted
explain that, in Agile, working software is the primary measure of progress. Then help…
Q102. When planning a meeting, which action is most important?
clariying the expected outcome
taking notes
inviting the Project Manager
making sure everyone speaks
Q103. You are facilitating a meeting and, unexpectedly, a key person doesn’t attend. What should you do?
Hold the meeting and update the person who could not attend later.
Ask the person who could not attend to reschedule the meeting based on their availability.
Ask all meeting partecipants what they want to do about the one person’s absence
Reschedule the meeting for when all necessary people can attend
Q104. What is Open Space?
a design concept for team rooms
a room for teams to demo their work
a placeholder in the code body for the future functionality
a meeting format where participants create and manage the agenda
Q105. Which choice is not an expected benefit of refactoring?
Refactoring can reduce the effort for future development
Refactoring is used to fix bugs
Refactoring improves the design of the system
Refactoring improves the maintainability of the code
Q106. In the Scaled Agile Framework, consecutive iterations are grouped together into a PI. What is a PI?
Project Increment
Portfolio Increment
Product Increment
Program Increment
ReferenceA Program Increment (PI) is a timebox during which an Agile Release Train (ART) delivers incremental value in the form of working, tested software and systems. PIs are typically 8 – 12 weeks long.
Q107. How an you improve interaction between team members?
Move people’s workstation around in the team room to create new social possibilites
Since no one has come to you with a compliant, assume that the limited interaction works for everyone
Ask the team if they would like to do something recreational together and offer to organize it
Tell the team that you see this as a problem and ask them to solve it
Q108. Which scale is typically used for Planning Poker?
less than 1 hour, 1 to 4 hours, 4 to 8 hours, 8 to 24 hours, more than 24 hours
2, 4, 6, 8, 10
XS, S, M, L, XL
1, 2, 3, 4, 5, 8, 13, 20
Q109. You are the Scrum Master and, having just facilitated a meeting, you’re reflecting on ways to improve. What skill are you displaying?
being self-aware
being extroverted
having type A personality
being someone who takes charge
Q110. What background information is most important for a successful Product Owner to understand?
The budget for the product.
The underlying technology of the product.
The development team’s strengths and weaknesses.
The business context for the product.
Q111. You are facilitating a meeting to decompose user stories and, unexpectedly, a development team member cannot attend. What should you do?
Hold the meeting and update the person who could not attend later.
Ask the person who could not attend to reschedule the meeting based on their availability.
Ask all meeting participants what they want to do about the one person’s absence
Reschedule the meeting for when all necessary people can attend
Q112. As the Scrum Master, you’ve observed that team members are more comforatble communicating via instant messaging than through direct conversions. How can you encourage conversation between team members?
Move people’s workstation around in the team room to create new social possibilities.
Since no one has come to you with a complaint, assume that the limited conversation works for everyone.
Tell the team that you see this as a problem and ask them to solve it.
Ask the team if they can think of ways to increase direct converstaion.
Q113. What is the expected outcome of the Daily Scrum meeting?
updated status on all of the work
team alignment on its plan for the day
a list of impediments and priorities
a report to the Product Owner of stories ready to be accepted
Q114. Which statement about the actor in a user story can be true?
There must be multiple personas for each actor.
The actor does not have to be a specified role in the solution.
The system cannot be the actor.
The actor can be the system itself.
Reference Actors can be a person, group, or system(s).
Q115. In Agile, which of the following options is a high priority?
Comprehensive documentation
Processes and tools
Contract negotiation
Working software
ReferenceAgile projects are characterized by a series of tasks that are conceived, executed and adapted as the situation demands and one of the priorities is working software.
Q116. What types of environments work best for Agile principles?
It works great in static environments.
It works great in dynamic environments.
It works great in customer environments.
Agile has been proven to not work in any good environment.
ReferenceThe Agile environment appeals to quick actions, discussions, evaluations, and considerations for different approaches. It works great in dynamic environments where there is a potential for changing or evolving requirements.
Q117. What does being a Cross-Functional team mean?
That every team in the organization has a particular specialism
That each team member has their own specialism
That all the skills necessary exist within the team
That teams can communicate effectively
Q118. What is a PBI?
Product Before Increment
Project Billing Information
Productive Backlog Increment
Product Backlog Item
Q119. Which of the following scrum events is dedicated to process improvement?
The sprint planning
The daily scrum
The sprint retrospective
The sprint review
Q120. For a month-long sprint, the time-box for a sprint retrospective is _.
3 hours
6 hours
8 hours
1 hour
Q121. Which type of Kanban diagram shows the number of issues in each of the states?
burn down chart
control chart
burn up chart
cumulative flow
Q122. Which of the following statements about a Kanban control chart is false?
The light blue shaded area is the standard deviation.
The green dots are the issues themselves.
The control chart works best when the tasks that you’re tracking are of different sizes.
The blue line is the rolling average cycle time.
Q123. What does EBM consider in Managerial Decisions?
Productivity and ethical concerns
Circumstance and ethical concerns
Circumstances and financial concerns
Moral and ethical concerns
Q124. Stacey’s process complexity model shows us that agile thinking is best **___**.
Q126. Which Jira feature provides an overview of multiple projects?
roll-up boards
code integration
task automation
reporting
Q127. Which of the following elements is not a pillar of Scrum?
adaptation
transparency
sustainability
inspection
Q128. What aspects of the product is the Product Owner responsible for?
Guiding the Development Team on the product
Managing and owning the backlog
All of the choices are correct
The product itself
Q129. In Scrum, at the end of each sprint, there is a _ meeting in which the team receives and gives feedback on their processes and their performance.
retrospective
review
reflection
sprint
Q130. In the INVEST acronym for user stories, what does the “V” stand for?
valuable
verifiable
veracity
voluminous
Q131. Having a mindset focused on growth and opportunity is healty for Agile team members. How can you display a growth mindset?
See challenges as opportunities
Point out the failures of others
Quit while you’re ahed
Celebrate only when you succeed
Q132. The Scaled Agile Framework advocates that, if you measure only one thing, what should you measure?
cost of delay
return on investment
quality
predictability of delivery
Q133. Which statement about the Agile Manifesto is true?
It was written via crowdsourcing and its authors are unknown
It was written in 2001 and is obsolete.
It was written in response to documentation-heavy software development project practices.
It was first published as part of Jim Highsmith’s doctoral thesis.
Reference"(...)others sympathetic to the need for an alternative to documentation driven, heavyweight software development processes convened." [First paragraph]